Thanks to its excellent location by the S8 expressway and convenient access to other highways, including the A2, it provides easy domestic and international transit. Construction works started in the second quarter of 2021 and will be completed in early 2022.
Thanks to such a perfect location and convenient access to other highways, including the A2, it provides easy domestic and international transit.
Location:
Ul. Ekologiczna, Urzut
GPS: 52.06329224728844, 20.748803810593845
S8 Expressway
A2 Highway
Chopin Airport
Warsaw (Center)
Construction | Steel with reinforced concrete columns and truss girders | Exterior walls | A thermally insulated sandwich panel, finished on both sides with a sheet |
Roof and roof covering | Steel trusses, steel girders with steel purlins, PVC membrane |
Storage height | 10 m |
Column spacing | 22.5 m x 12 m and 22.5 x 24 at unloading docks. |
Floor load | 5 T / m² or 50 kN / m² |
Installations | Heating - gas radiators, ventilation - mechanical, sprinkler and hydrant installation - storage area |